Building defect rectification & related works Malaysia · Building, property & project managers
Building defects / Rectification

DEFECTS
FOUND.
FIXED.
CLOSED.

We find building defects, classify them, put them right and close them out. The same team handles roof repair, waterproofing, plumbing, office partitions and related maintenance.

Defect inspection
Ceilings, walls and finishes checked before handover.
Inspect / Classify / Rectify / Close out Roof · Waterproofing · Plumbing · Partitions Defect list to close-out ↗
01 / Common defects

Seen any
of these?

Defects that show up in finished buildings. If one looks familiar, send us the location and a photo through the enquiry form.

Cracks running across a pale rendered wall
01 /

Wall & ceiling cracks

Cracks raked out, filled, re-skimmed and repainted.

↗
Cracked and broken octagonal floor tiles
02 /

Hollow or cracked tiles

Hollow or damaged tiles lifted, re-bedded or replaced, then re-grouted.

↗
Dark damp and mould streaks on a white painted wall
03 /

Ceiling leaks & damp patches

The leak traced to its source and fixed, then the stained surface made good.

↗
Damp stains, mould and peeling paint on the wall around a timber window
04 /

Water ingress at windows & wet areas

Gaps at frames, joints and floors sealed or waterproofed, then finishes reinstated.

↗
Paint and skim coat flaking off a wall, showing the plaster beneath
05 /

Poor paint & skim-coat finishes

Uneven or flaking surfaces stripped back, re-skimmed and repainted.

↗
Water spraying from a clamped joint on a pipe
06 /

Leaking pipes & fittings

The faulty pipe, joint or fitting repaired or replaced, and the area reinstated.

↗
02 / Services

Defects first.
Six services.

Defect rectification is our core work. Roof repair, waterproofing, plumbing, office partitions and related maintenance are carried out by the same team, so one contact covers the whole defect list.

01 / CORE

Defect
Rectification

Wall and ceiling cracks, hollow or cracked tiles, uneven skim coat and paint finishes, and scratched marble or timber flooring. Each item repaired, re-tiled, re-skimmed, repainted or polished, then checked off the defect list.

↗
02 / ROOF

Roof
Repair

Leaking or damaged roofing, cracked or slipped roof tiles, failed flashing, and blocked or leaking gutters. Repaired at the source, then the stained ceilings below are made good.

↗
03 / LEAKS

Water
Proofing

Ceiling leaks, damp patches and water ingress at windows, bathrooms, balconies and other wet areas. We trace where the water gets in, treat the source, then reinstate the finishes.

↗
04 / PIPEWORK

Plumbing
Services

Leaking pipes, poor water pressure, slow or blocked drains, and faulty sanitary fittings. Faults traced, pipework repaired or replaced, and the surrounding finishes reinstated.

↗
05 / INTERIOR

Office
Partition

Misaligned or damaged partitions, gaps at joints and ceilings, and doors that don't close properly. Partitions realigned or repaired, or new ones installed and altered to suit the layout.

↗
06 / EXTERIOR & SITE

Other
Defect-Related
Maintenance

Exterior wall cracks on high-rise facades, damaged glass and aluminium glazing, and faded carpark lines and indicators. Also signage, manhole servicing, concrete imprint, and tree and grass trimming.

↗
03 / Developer solutions

Key collection
to close-out.

Defect support for developers and their project teams from key collection, through the Defect Liability Period (DLP), to close-out. Every reported defect is inspected, classified, rectified and tracked in one place, so you can see where each item stands.

01 /

Inspection & defect lists

Units and common areas inspected, with each defect recorded by location and trade.

02 /

Defect classification

Items sorted by type, location and trade, so work can be planned by block, floor or phase.

03 /

Subcontractor coordination

Trades scheduled against the defect list, working alongside the main contractor and consultants.

04 /

Quality control & sign-off

Rectified work checked against the original defect, with records kept for sign-off and close-out.

05 /

Customer service & complaints

A single point of contact for purchasers' defect reports, follow-ups and complaints until each item is closed.

Enquire About DLP Support

Project managers & executives · Building managers · QS · Architects

04 / Who we work with

One defect list.
Many desks.

What each role gets from one team that inspects, rectifies and closes out building defects.

01 /

Building Managers

Resident complaints traced to the cause, fixed and closed out. Common areas kept in order, with one contact for the whole defect list.

02 /

Project Managers & Project Executives

Defect lists cleared before handover and through the Defect Liability Period. Each item tracked by block, floor and trade, so you can see what is still open.

03 /

Property Management Teams

One team for defects, leaks and repairs, from a single unit to the common areas. Each job reported back in plain terms you can pass on to owners.

04 /

Management Corporation Managers & Executives

Work on common property scoped and agreed before it starts. A record of what was found and fixed, ready to put to the committee.

05 /

Quantity Surveyors

Work scoped item by item, by location and trade. Each item can be measured, valued and checked against the completed work.

06 /

Architects

Rectification carried out to the specified finish and detail. Questions on materials or method raised with you before work starts.

Send Your Defect List
05 / How we work

Every defect,
start to finish.

01

Report & inspect

Send the site location and your defect list or a description. We inspect on site where needed.

02

Classify & scope

Each defect sorted by type, location and trade, and the scope of work agreed with you.

03

Rectify

The right trade fixes each item, in the agreed order and scope.

04

Verify & close out

Work checked against the original defect, then closed out and documented where agreed.

06 / Questions

Defect
questions.

Common questions from building managers, project teams, management corporations, QS and architects. For anything else, ask through the enquiry form.

What counts as a building defect?

Broadly, any part of the building that is faulty or not finished to the expected standard: cracks, hollow or cracked tiles, uneven finishes, leaks, damp, and fittings or services that don't work as they should. Who is responsible for rectifying an item depends on the sale and purchase agreement and any building contract involved.

What is the Defect Liability Period, and how do you help during it?

The Defect Liability Period (DLP) is the period after handover during which the developer is responsible for rectifying defects reported by purchasers. Its length and terms are set out in the sale and purchase agreement. We support developers through it by inspecting reported defects, classifying them, coordinating the trades needed and checking completed work before close-out.

What happens at a joint inspection?

A joint inspection is a walk-through of a unit or common area with the parties involved, such as the developer's project team, the management body or the purchaser, to agree and record each defect. We can attend, log every item by location and trade, and use that list to plan the rectification.

Can you handle defect lists across a whole block or phase?

Yes. A large defect list can be classified by block, floor and trade, then rectified in an agreed sequence, working alongside the main contractor and consultants where needed. Tell us the scope and we will discuss how to plan it.

How do I get a quote?

Send an enquiry through the form below with the site location, the service needed and a short description of the defects or a summary of your defect list. We will get back to you to discuss the scope and, where needed, inspect on site before quoting.

07 / Report defects

GOT A
DEFECT
LIST?

Send us the site, the defects or the work needed. We will discuss a practical scope for your building or development.

Building managers / Project teams / Management corporations / QS & architects

Defect enquiry

Up to 5 files, 5 MB each. Photos (JPG, PNG, WEBP), PDF, Excel, CSV or Word.

All fields except defect details and files are required.